A straight read on where we work, what we build, what we need from you to move fast, and how long projects typically run. If the answer is yes after reading this, we'll move fast on it together.

01 · Where We Build

California first. Arizona second. Open to the right relationship.

  • ›All of Southern California (our core market).
  • ›The rest of California for multi-site rollouts and repeat clients.
  • ›Arizona for repeat franchisor partners and multi-site rollouts.
  • ›Other markets are on the table when the right relationship is driving the work.
02 · What We Build

Tenant improvement and build-outs, 1,500+ sqft.

Primary verticals:

  • ›Health, beauty, wellness, and fitness
  • ›Retail
  • ›Food and beverage
03 · What We Need From You to Bid Fast

Three things and we're moving.

  • ›A set of plans, even if they're still in rough-draft form.
  • ›The landlord work letter.
  • ›Site control.

If you don't have all three yet, talk to us anyway. We've helped a lot of brands and franchisees get to that point.

04 · Typical Timeline

Average build is right around 90 days.

  • ›Smaller franchise build-outs typically run 8 to 10 weeks.
  • ›The vast majority of our projects come in at 16 weeks or less.
  • ›Larger or highly complex builds occasionally stretch to 18 to 20 weeks. Those are the exception.

Complexity drives the timeline more than square footage. Heavy MEP, structural scope, custom millwork, and jurisdiction-specific requirements all influence the schedule.

FAQ

Most-asked questions about how we work.

Sound like a fit?

Let's get the first 15 minutes on the calendar.

Pick an intro slot and tell us a little about your project. We'll come back with a real conversation about scope, market, and whether KSC is the right team for your build.